The Héctor Figueroa School completed on time with planning and schedule control from CPM Scheduling Consultants.

NYSCA PS 398

Stanley Eugene Clark Primary School, an example of educational infrastructure managed using CPM scheduling.

Project Description

The project involved construction of a new four-story school building. This new building included a partial cellar and a mechanical penthouse with a rooftop play area at the main roof level. At the cellar level, the building plan incorporated a water service and an electrical service room. The first floor level featured the main entrance at the street level, a cafeteria, kitchen, Pre-K classrooms, and a double-height entrance lobby with a connecting stair leading to the General Offices on the second floor. The second floor level incorporated academic functions, a nurse’s office, a General Office, and the Principal’s office. On the third floor, academic functions were included, along with the school library and the guidance office. The fourth floor level incorporated academic functions, a staff lunch/work room, and the Gymatorium. At the fifth floor level, the building plan included the Mechanical equipment room, the upper level of the gymnasium, and the roof top play area, which was enclosed with a steel frame and wire mesh at the perimeter and the roof. The building was organized with exit stairs located at the East and West ends, connected by a double-loaded corridor, and two elevators served all floors.

Construction Company

Project Info

Project Location
Governing Agency
Project Size
Project Start
Estimated Project Finish